Koraput: Amid heightened tension along the Odisha-Andhra Pradesh border ahead of the neighbouring state’s panchayat elections scheduled for Dec 2, the Koraput administration has ordered an immediate halt to the construction of a shop on the premises of Sri Jagannath temple at Nerediwalasa village under Kotia gram panchayat in Pottangi block.Sub-collector-cum-sub-divisional magistrate Fabi Rasheed issued the prohibitory order under Section 163 of the Bharatiya Nagarik Suraksha Sanhita (BNSS), 2023, on Wednesday, directing Malti Khora, who was undertaking the construction, to stop the work until further orders.The order stated that Nerediwalasa falls in the sensitive inter-state border region and that continuation of the construction during the prevailing election-related situation could trigger tension, confrontation and disturbance of public peace and tranquillity.The development comes against the backdrop of the long-standing territorial dispute between Odisha and Andhra Pradesh over Kotia gram panchayat in Koraput district. The panchayat comprises 28 villages, 21 of which have been claimed by Andhra Pradesh. The dispute, which dates back several decades, has remained unresolved, with Supreme Court maintaining the status quo since 1968. Both states have been making efforts to strengthen their administrative presence and implement welfare schemes in the disputed villages.Andhra Pradesh’s decision to conduct panchayat elections in the disputed region has further heightened tensions. The neighbouring state is scheduled to hold elections on Dec 2, raising concerns in Odisha over possible attempts by Andhra Pradesh officials to establish their presence in Kotia through the electoral process. Odisha political parties and the district administration have maintained that polling should not be allowed inside the disputed territory.The Koraput administration has directed the inspector-in-charge of Kotia police station to ensure strict compliance with the order and take preventive measures to stop further construction inside the temple premises. The Pottangi tehsildar has also been asked to extend necessary administrative cooperation.However, the administration clarified that the order is purely preventive and does not amount to a final decision on the legality of the construction or the proposed demolition of the shop. “A separate date of hearing will be fixed to give Malti Khora an opportunity to present her explanation and relevant documents regarding the alleged unauthorised construction. The issue of its legality and possible demolition or removal will be examined separately in accordance with the law,” the order stated.The ex parte order, issued citing the urgency of the situation, will remain in force for a maximum period of one month unless rescinded or modified earlier.
