Berhampur: As Akvan approaches the state coast and incessant rain began under its influence, engineers of water resources intensified round-the-clock monitoring and night patrolling of vulnerable river stretches, reservoirs and embankments across Ganjam and Gajapati districts.Sstavigilance is being maintained at almost all 10 reservoirs in Ganjam and Gajapati districts, where the teams have been stationed round the clock to monitor water levels, reservoir conditions and dam safety, said engineer-in-chief Dillip Kumar Rout, water resources.These include the Rushikulya river near Purushottampur bridge to monitor water levels, its Left Flood Bank (LFB) near Purushottampur NAC and Bhimpur village, and Ghadaka Nala at Golanthara Anicut. Patrolling is also being carried out along the branch canal near Brahmapur, at Jayamangal anicut and the Ghodahada river breach site, and along the Ghodahada river under Hinjili Irrigation Sub-DivisionNight patrolling has also been intensified along vulnerable stretches of the Loharakhandi in Bhanjanagar. Field personnel are maintaining continuous surveillance to assess river conditions and facilitate immediate intervention, wherever necessary, said Jagannath Pani, chief engineer, here. The filed tams are maintaining round-the-clock vigilance at these locations to monitor changing conditions and ensure immediate response to any emerging situation, he saidAs part of the enhanced preparedness measure, Rout has directed senior engineers to remain stationed in their assigned districts from Thursday to Sunday. The officers have also been deployed in other districts including Balasore, Bhadrak, Keonjhar, Puri and Kendrapara districts, covering the Subarnarekha, Budhabalanga, Baitarani, Brahmani and Mahanadi river systems, said RoutThe officers have been instructed to inspect vulnerable embankments, flood-control structures and riverbank protection works; review preparedness arrangements; supervise restoration activities; and maintain close coordination with district administrations and field-level officials to ensure prompt action in case of any eventuality.Sources said principal secretary, water resources Shubha Sarma, and the engineer-in-chief are closely monitoring the situation and regularly reviewing preparedness measures to ensure coordinated action.
